Make your next launch measurable.
Describe the change and what you expect it to do. Skene drafts the measurement plan, finds the signals still missing, and reads the result after launch.
No card required. Sign in, connect a source, describe what you are shipping.
The plan names what is missing.
Verification checks each required event and field against the available evidence. Ready, missing and unverified describe different situations. A named requirement tells your team what needs attention.
See whether your launch is moving toward its goal.
Follow the milestones you defined in your plan. See which features users are adopting, where progress stalls, and whether activation is moving toward your target.
- 01Connected a source120 users12.0% of cohort
- 02Created a workflow76 users7.6% of cohort
- 03Completed first run38 users3.8% of cohort
Activated = completed all three milestones within seven days.
Up 0.6 percentage points from before launch.
Moving toward the 4.0% targetTarget not yet reachedEach cohort has a full seven days to activate.
Milestone counts include every preceding step. Change shows direction, not what caused it.
Start the next version with the evidence still attached.
A check can suggest a Next version focus. Keep the previous plan on the record while you decide what to test next.
Keep the result. Change the next hypothesis.
Create next version preserves the previous hypothesis and verification results. The new version is where the next change belongs.
Before you describe what you're shipping.
The questions a plan owner asks first.

